3rd Industrial City, Jeddah, Kingdom of Saudi Arabia Aramco Vendor #10116102
ALFA AL-ARABIA ALFA AL-ARABIA Manufacturing Co. · KSA
ALFA AL-ARABIA
Request Quote Upload BOQ +966 50 183 5126 التحويل إلى اللغة العربية
DIRECT FACTORY PRICING

Upload Bill of Quantities (BOQ) Schedule & Tender Drawings

Submit your itemized civil, infrastructure, or MEP piping schedule directly to our central estimating department in Jeddah. We extract line items, calculate total metric/imperial meterage, verify pressure class requirements, and return an official commercial tender quote with site delivery milestones.

BOQ inquiry

Describe your BOQ / tender package. File upload is not accepted by the web endpoint yet — email schedules to sales@alfaalarabia.co or note the file name below. Acknowledgement only — no same-day or stock promises.

  1. 1. Contact
  2. 2. Package

Contact details

Who should ALFA reply to about this BOQ?

BILL OF QUANTITIES TAKEOFF

BOQ Submission Guidelines & Engineering Takeoff Protocol

Accelerate your tender bid with itemized BOQ estimation, material optimization, fitting takeoff schedules, and certified consultant MAR submittals.

BOQ File Format Supported Content Automated Analysis Engineering Output Generated
Microsoft Excel (.xlsx / .xls) Standard civil & MEP tender Bill of Quantities Diameter, standard & length parsing Line-item priced schedule + solvent/gasket estimate
Adobe PDF (.pdf) Scanned tender documents, project specs, drawings Technical specification verification Commercial quotation + matching MAR submittal dossier
CAD Drawings (.dwg / .dxf) Utility layout plans, pipeline profiles, pump rooms Fitting count & sweep bend radiuses Custom spool piece fabrication schedule
BOQ FAQS

12 Frequently Asked Bill of Quantities Questions

Practical advice on submitting tender schedules, partial BOQs, value engineering, and turnaround times.

1. What information must be included in the uploaded BOQ?

For fastest estimation, include nominal pipe diameter, governing standard (DIN 8062, ASTM D1785, NEMA TC-2, etc.), pressure class (PN rating or Schedule), linear meters, and project destination city.

2. Can our estimating team upload partial or incomplete BOQ schedules?

Yes. If fitting quantities or trench lengths are tentative, upload what you have. Our piping engineering desk will calculate recommended accessory allowances and fitting schedules based on typical Saudi project ratios.

3. How are proprietary or unspecified competitor items handled?

If your BOQ lists generic descriptions or competitor brand names, we cross-reference them to ALFA's certified Saudi-manufactured equivalent products, accompanied by consultant cross-reference compliance sheets.

4. Can ALFA review our BOQ for value-engineering cost savings?

Yes. Our senior estimators frequently identify significant savings by optimizing pipe pressure classes by zone (e.g. using PN 10 where PN 16 is over-specified) and substituting expensive metallic fittings with fabricated uPVC bends.

5. How is file confidentiality and project data privacy protected?

In accordance with Saudi Aramco SACS-002 cybersecurity standards and corporate NDAs, all uploaded documents, contractor bid details, and tender schedules are encrypted and strictly confidential.

6. How fast will we receive the priced takeoff sheet?

Standard Excel BOQs are parsed and returned with factory-direct unit rates within 1 to 2 business hours. Highly complex multi-discipline packages are delivered within 4 to 12 hours.

7. Does the takeoff include wastage allowances?

Our takeoff itemizes exact net pipeline lengths alongside recommended site cutting and alignment wastage allowances (typically 3% to 5% for buried runs) to avoid contractor shortage delays.

8. Can we request delivery broken down into phased construction call-offs?

Yes. You can indicate your project schedule milestones, and our pricing will reflect structured batch dispatches synchronized with your civil trenching and MEP installation timeline.

9. Will the quotation match our contractor tender submission deadline?

Yes. You can state your required bid deadline in the message notes, and our estimating desk will prioritize your takeoff to ensure you receive pricing well ahead of your tender closing.

10. Can ALFA supply the complete MAR submittal binder with the takeoff?

Yes. We generate a complete customized Material Approval Request (MAR) packet tailored to your BOQ line items, ready for immediate submission to the supervising consultant.

11. Are large multi-phase BOQs eligible for special project rate agreements?

Yes. For giga-projects and municipal tenders exceeding 20,000 meters, our commercial executive committee provides special fixed-price index rate agreements for the entire contract duration.

12. Who can I contact to verify receipt of our uploaded BOQ?

Call our commercial estimating hotline at +966 50 183 5126 or email sales@alfaalarabia.co. We confirm receipt of all uploaded tender files within 15 minutes.