How to Order from ALFA AL-ARABIA. ALFA AL-ARABIA Manufacturing Co., Jeddah. Aramco Vendor #10116102.
ALFA AL-ARABIA Manufacturing Co. provides a streamlined procurement process for contractors, consultants, distributors, and end-users across Saudi Arabia. Our Jeddah factory ships factory-direct to all 13 administrative regions. Contact our sales engineering desk for project-specific pricing and technical documentation.
| Company | ALFA AL-ARABIA Manufacturing Co. |
|---|---|
| Location | 3rd Industrial City, Jeddah, KSA, KSA |
| Aramco Vendor | #10116102 |
| Phone | +966 50 183 5126 |
| sales@alfaalarabia.co |
Direct pricing from the Jeddah plant, with technical submittal support.
Step-by-step contractor procurement manual detailing the complete purchasing process from initial tender BOQ submission and MAR approval to factory dispatch and site receiving.
| Procurement Stage | Action Required by Contractor | ALFA Deliverable | Standard Timeline | Milestone Output |
|---|---|---|---|---|
| Stage 1: Estimation & Quote | Submit BOQ schedule or size list | Itemized commercial tender quotation | Within 1 business hour | Firm unit pricing & delivery schedule |
| Stage 2: Technical Approval | Request project-specific submittal | Complete consultant MAR binder & samples | Within 2 to 4 hours | Consultant approval (Code A/B) |
| Stage 3: Order Confirmation | Issue formal Purchase Order (PO) | Order Confirmation & production slotting | Same day | Scheduled dispatch date confirmed |
| Stage 4: Dispatch & Receiving | Arrange site offloading crane/forklift | Dedicated flatbed delivery + MTC 3.1 | 24–48 hours transit | Material Inspection Request (MIR) sign-off |
Real-world procurement, compliance, testing, and delivery clarifications for project contractors.
Submit your purchase order (PO) referencing your quotation number to sales@alfaalarabia.co or contact your dedicated commercial account engineer directly.
Your PO should specify: ALFA quote reference, project name, delivery jobsite address, site contact person/phone, required delivery date, and itemized sizes/quantities.
Our order processing desk issues an official Order Confirmation document within 2 hours of PO receipt, specifying your confirmed production and dispatch dates.
Yes. You can issue a single master purchase order with scheduled call-offs, ensuring locked-in volume pricing while receiving materials in manageable site phases.
Standard sizes in DIN 8062, ASTM D1785, and NEMA TC-2 are maintained in finished inventory and can be dispatched within 24 hours of order confirmation.
Custom fittings and sweep bends require approved contractor shop drawings. Production lead times typically range from 2 to 5 business days from drawing sign-off.
Yes. We supply complete accessory packages with every pipe order, calculating the precise quantity of cement, primer, and gasket lubricant needed for your linear meters.
Every shipment arrives with: authenticated Delivery Note, batch Mill Test Certificate (MTC Type 3.1), warranty letter, and SASO compliance certificate.
Submit our Credit Application form along with your company credentials 3 to 5 days prior to your order date to activate a 30 to 60-day credit facility.
Call our commercial coordination desk at +966 50 183 5126 or email sales@alfaalarabia.co for real-time order status and GPS delivery updates.
Direct manufacturer pricing from 3rd Industrial City, Jeddah, KSA, backed by Saudi Aramco Vendor Code #10116102 and certified MTC Type 3.1 documentation.