Standard practice covering the installation of thermoplastic pipe for sewers and other gravity-flow applications in underground trenches, including bedding, backfill, and compaction requirements.
| Standard Code | ASTM D2321 |
|---|---|
| Full Title | Underground Installation of Thermoplastics Pipe |
| Scope Category | Installation |
| ALFA Compliance | ✅ Full Compliance — Verified Production |
| Aramco Vendor Code | #10116102 |
Standard practice covering the installation of thermoplastic pipe for sewers and other gravity-flow applications in underground trenches, including bedding, backfill, and compaction requirements. This standard is widely referenced in Saudi Arabian infrastructure specifications, including those issued by the National Water Company (NWC), Saudi Aramco, Royal Commission (Jubail/Yanbu), and MODON industrial cities. ALFA AL-ARABIA's manufacturing quality system (ISO 9001:2015) ensures continuous compliance throughout production, testing, and delivery.
Contact ALFA AL-ARABIA's sales engineering desk for project-specific pricing, delivery schedules, and Material Approval Request (MAR) documentation for ASTM D2321.