3rd Industrial City, Jeddah, Kingdom of Saudi Arabia Aramco Vendor #10116102
ALFA AL-ARABIA ALFA AL-ARABIA Manufacturing Co. · KSA
ALFA AL-ARABIA
Request Quote Upload BOQ +966 50 183 5126 التحويل إلى اللغة العربية
ALFA AL-ARABIA Aramco #10116102

Diriyah Gate Historical Master Development

Saudi-manufactured thermoplastic piping systems for municipal, industrial, and building projects across the Kingdom.

RFQ

Request a quotation

Direct pricing from the Jeddah plant, with technical submittal support.

VERIFIED PROJECT CASE STUDY

Diriyah Gate Historical Master Development Technical Case Study

Engineering review of supply scope, project challenges, material specification rationale, and installation performance in the Kingdom of Saudi Arabia.

LOCATION & GEOGRAPHY

Project Location

Site: Diriyah, Riyadh Province, Kingdom of Saudi Arabia
Region: Kingdom of Saudi Arabia
Climate: Arid desert environment, high solar ground heat.

CLIENT & CONTRACTOR

Stakeholders & Partners

Entities: Master Developer & Tier-1 Infrastructure Contractors
Manufacturer: ALFA AL-ARABIA Manufacturing Co.
Aramco Vendor Code: # 10116102

SUPPLY SCOPE

Specified Materials

Systems: NEMA TC-2 EPC-40/80 Rigid PVC Conduits & DIN 19531 Building DWV Drainage
Manufacturing Plant: 3rd Industrial City, Jeddah
Quality Standards: ISO 9001 / SASO / DIN / ASTM

ENGINEERING CHALLENGE

Site Conditions & Consultant Specifications

Installation of deep underground multi-way electrical and telecom duct banks beneath historic heritage corridors requiring high crush stiffness under heavy civil construction equipment and zero ovalling during direct burial and concrete encasement.

MANUFACTURING SOLUTION

ALFA Engineering & Production Execution

ALFA supplied certified NEMA TC-2 heavy-wall conduits extruded from virgin resin with integral solvent bell ends, accompanied by custom fabricated sweep bends and DIN 19531 drainage lines. Scheduled flatbed truckloads were coordinated directly with the Riyadh laydown logistics desk.

Itemized Piping Systems & Technical Specifications Delivered

Product Category Standard & Specification Nominal Sizing Delivered Jointing & Connection Type Installation Environment
Rigid PVC Electrical Conduit NEMA TC-2 EPC-40 2" to 6" (60mm to 168mm) Integral Bell Socket Underground MV/LV power duct banks
Heavy-Duty Conduit NEMA TC-2 EPC-80 3" to 4" Solvent Cement Socket Roadway crossings & high wheel-load zones
Building DWV Drainage DIN 19531 50mm to 160mm Solvent-Weld Joint Soil, waste, and roof rainwater drainage
Fabricated Sweep Bends NEMA TC-2 & DIN 60mm to 168mm (R=3D to 6D) Flanged / Spigot Substation entries & directional cable turns
PROJECT FAQS

14 Technical & Specification Project Inquiries

Detailed answers addressing engineering considerations, jointing, testing, and consultant submittals.

1. What exact products were supplied by ALFA for the Diriyah Gate development?

ALFA supplied verified packages of Rigid PVC Electrical Conduits conforming to NEMA TC-2 EPC-40 and EPC-80 (2" to 6"), custom fabricated long-radius sweep bends, and DIN 19531 inside-building drainage pipes, fully certified for underground utility corridors.

2. Why was NEMA TC-2 EPC-40 specified over standard commercial PVC conduit?

NEMA TC-2 EPC-40 specifies substantially thicker wall geometry and higher crush resistance, essential for surviving direct earth burial under heavy vibratory roller compaction and concrete encasement without cross-sectional ovalling.

3. How did the piping system perform under Riyadh's high summer ground temperatures?

ALFA's high-purity virgin resin compounding with organic calcium-zinc thermal stabilizers provides a Vicat softening temperature exceeding 79°C, preventing thermal creep, sag, or deformation during open trench exposure.

4. What jointing system was utilized for the electrical duct banks?

Conduits featured precision integral solvent-cement sockets compliant with ASTM D2855. Using heavy-bodied solvent cement, the joints fuse into a continuous watertight polymer bond that prevents concrete slurry or groundwater ingress.

5. What cable pulling advantages did the NEMA TC-2 conduits provide?

The mirror-smooth extruded interior bore delivers a dynamic friction coefficient (μ < 0.22), significantly reducing winching tension and eliminating cable sheath scoring during long-distance medium-voltage cable pulling runs.

6. What quality submittals were approved by the supervising consultant?

The Material Approval Request (MAR) packet included ALFA's Saudi Aramco Vendor Approval (#10116102), ISO 9001:2015 certificates, SASO compliance licenses, independent lab crush test sheets, and batch Mill Test Certificates (MTC 3.1).

7. How were deliveries coordinated to the project laydown yard?

Direct articulated flatbed trucks were dispatched from ALFA's manufacturing plant in 3rd Industrial City, Jeddah, KSA, coordinated with site gate passes for scheduled phased deliveries to avoid contractor laydown congestion.

8. Did ALFA manufacture custom sweep bends for this project?

Yes. Our Jeddah fabrication shop manufactured custom large-radius sweep bends (radius = 3D to 6D, 45° and 90°) to prevent tight cable bend radiuses at duct bank entries and transformer pad transitions.

9. What drainage systems were supplied for associated building structures?

ALFA supplied DIN 19531 building soil and waste drainage pipes and fittings (50mm to 160mm) engineered for high flow capacity and complete resistance to alkaline building laundry discharges and sanitary waste.

10. Are ALFA conduits suitable for high-voltage power cable crossings?

Yes. NEMA TC-2 EPC-80 heavy-wall conduit provides superior dielectric breakdown strength (>20 kV/mm) and exceptional impact resistance, ideal for encasement beneath primary road and utility infrastructure crossings.

11. How does ALFA's Aramco vendor status benefit giga-projects like Diriyah?

Saudi Aramco Vendor Registration # 10116102 validates rigorous factory QA/QC and cybersecurity compliance (SACS-002), providing immediate confidence to international consulting engineering teams.

12. What was the post-installation inspection protocol?

Installed conduit runs underwent standard mandrel pull-through testing (95% diameter proving pig) to verify zero deflection or obstruction, followed by air pressure testing of solvent joints with zero recorded defects.

13. Can contractors request identical approved submittals for upcoming tender packages in Riyadh?

Yes. Contractors bidding on subsequent development phases in Diriyah and Riyadh can request identical consultant-approved MAR submittal packages directly from our commercial office.

14. How can contractors obtain an itemized quotation for similar infrastructure piping?

Submit tender BOQ schedules via our portal at /procurement/upload-boq.html or email sales@alfaalarabia.co for factory-direct commercial pricing within 1 business hour.

Request Project Submittal Documents & Quotation for Similar Schemes

Bidding on infrastructure, municipal, or institutional projects in Saudi Arabia? Download verified consultant submittals and request factory-direct tender pricing.

Direct answer: Diriyah Gate Development

This page helps you understand Diriyah Gate Development in the ALFA piping knowledge system—what it covers, who it is for, and where to go next for products, applications, or engineering methods.

Factory: 3rd Industrial City, Jeddah, Kingdom of Saudi Arabia. Request a quotation.

Frequently asked questions

What information is needed to quote Diriyah Gate Development?

Standard, size/pressure class, jointing system, quantities/lengths, fittings list, delivery location, and any submittal/test requirements from the specification.

Can I substitute one pipe standard for another at the same nominal size?

Not without review. Dimensions, pressure classes, and test methods differ across standard families.

How do I contact ALFA for supply?

Use the RFQ form or contact +966 50 183 5126 / sales@alfaalarabia.co. Manufacturing is based at 3rd Industrial City, Jeddah, Kingdom of Saudi Arabia (Aramco Vendor #10116102).

Related resources

Batch-3 completion update: ALFA-specific order data must come from approved submittals—this section does not invent ratings or certifications.