Chlorinated polyvinyl chloride piping delivering exceptional thermal endurance, chemical acid resistance, and high-pressure capacity for hospital hot water and refineries.
Direct pricing from the Jeddah plant, with technical submittal support.
Manufactured under Saudi Aramco Vendor Code #10116102 and ASTM F441 / ASTM D2846 standards. ALFA CPVC pipes maintain mechanical strength and high pressure containment up to 93°C (200°F). Ideal for commercial hot water circulation, hospital sanitization loops, and industrial acid-waste lines.
Schedule 40 & 80 High-Temp 93°C (1/2" - 8")
View Detailed Sizing & Specs →| Operating Temperature | Derating Factor | 2" Sch 80 Working Pressure | 3" Sch 80 Working Pressure | 4" Sch 80 Working Pressure | Recommended Application Environment |
|---|---|---|---|---|---|
| 23°C (73°F) - Ambient | 1.00 | 400 psi (27.6 bar) | 370 psi (25.5 bar) | 320 psi (22.1 bar) | Industrial chemical storage & transfer |
| 60°C (140°F) - Hot Water | 0.65 | 260 psi (17.9 bar) | 240 psi (16.5 bar) | 208 psi (14.3 bar) | Commercial laundry & central hotel hot water |
| 82°C (180°F) - High Temp | 0.38 | 152 psi (10.5 bar) | 140 psi (9.7 bar) | 121 psi (8.3 bar) | Hospital thermal disinfection & sterilizers |
| 93°C (200°F) - Maximum | 0.25 | 100 psi (6.9 bar) | 92 psi (6.3 bar) | 80 psi (5.5 bar) | Boiler feed condensate & chemical effluent |
Our CPVC Hot Water & Industrial Piping are manufactured using 100% virgin lead-free resin under strict ISO 9001 and Saudi Aramco Vendor #10116102 quality standards, delivering superior burst strength, thermal stability, and corrosion immunity.
Depending on the exact specification, systems comply with ASTM F441, ASTM F439, ASTM D2846, Saudi Aramco 9COM.
Available in sizes from 1/2" to 8" IPS, supporting Schedule 40 & Schedule 80 (Up to 450 PSI at 23°C).
Thermoplastic piping provides 100% galvanic corrosion immunity, making it impervious to high sulfate and chloride sabkha soils found in coastal Saudi regions.
Every order is accompanied by factory mill test certificates (MTC), dimensional compliance sheets, and third-party laboratory burst test reports.
Yes, our Jeddah fabrication plant manufactures matching sweep bends, tees, and flange adaptors fully rated for system working pressures.
Western Province: 24h; Central/Riyadh: 24-48h; Eastern/Northern/Southern: 48-72h.
Upload your tender BOQ schedule using the upload modal on this page or email sales@alfaalarabia.co for immediate factory-direct pricing.
CPVC prevents biofilm formation and bacterial colonisation (such as Legionella pneumophila), withstands aggressive chlorine hyperchlorination treatments, and never experiences pitting corrosion common in copper pipes.
Installers must use specialized heavy-bodied CPVC solvent cement complying with ASTM F493 (such as Corzan or Weld-On 714/724) preceded by an aggressive purple primer conforming to ASTM F656.
With 67% chlorine saturation, CPVC possesses outstanding chemical inertness against concentrated sulfuric acid, hydrochloric acid, nitric acid, sodium hydroxide (caustic soda), and brine across industrial plants.
Due to reduced flexural modulus at elevated temperatures, horizontal support hangers must be spaced closer (typically every 1.0m to 1.5m for 2" pipe at 80°C) with continuous support trays recommended for 90°C service.
CPVC has a Limiting Oxygen Index (LOI) of 60% (ambient air is 21% O2), meaning it cannot sustain combustion in air. It produces minimal smoke and satisfies UL 94 V-0 and NFPA 255 fire safety ratings.
Piping must cure fully (minimum 24–48 hours depending on temperature and diameter) before being hydrostatically tested at 1.5 times working pressure using clean water. Pneumatic (air) testing is strictly prohibited.