How ALFA AL-ARABIA NEMA TC-2 Electrical Conduit meets ASTM D2321 — Underground Installation of Thermoplastics Pipe. Verified factory testing and compliance documentation. Aramco #10116102.
| Standard | ASTM D2321 — Underground Installation of Thermoplastics Pipe |
|---|---|
| Scope | Installation |
| Product | Rigid PVC Electrical Conduits — NEMA TC-2 |
| Compliance | ✅ Factory-Verified Full Compliance |
| Aramco Vendor | #10116102 |
| ISO 9001:2015 | QAIC/SA/9001/0192 |
ALFA AL-ARABIA NEMA TC-2 Electrical Conduit pipes are manufactured at our Jeddah factory in full compliance with ASTM D2321 — Underground Installation of Thermoplastics Pipe. Standard practice covering the installation of thermoplastic pipe for sewers and other gravity-flow applications in underground trenches, including bedding, backfill, and compaction requirements. Our quality management system (ISO 9001:2015 — Certificate #QAIC/SA/9001/0192) ensures continuous monitoring and verification of all standard requirements throughout the production process.
Every production batch is tested in our in-house laboratory for compliance with ASTM D2321: dimensional verification, material testing, and performance validation per applicable standard requirements. Test certificates and compliance documentation are available as part of ALFA AL-ARABIA's Technical Submittal Package.
Request test certificates, material compliance statements, and factory inspection reports for NEMA TC-2 Electrical Conduit per ASTM D2321.
Request Documentation →